Faultless Linen
– St Louis, MO
A Softrol PPS Helps A New Plant Operate
Efficiently
Project
Summary
Situation:
Faultless Linen invested a significant
amount of money in a new plant with new
equipment. The plant was primarily
staffed with newly hired employees and
skill levels of those employees were
unknown.
Objective:
Maximize worker efficiency as soon as
possible to shorten the payback on their
investment.
Results:
Softrol installed a PulseNet
Productivity System (PPS) to report
operator efficiency in real time.
Pounds Per Operator Hour (PPOH)
increased 35% in the first
four months of operation.
In addition, production
supervisors no longer have to enter data
for daily production reports and are now
able to access these reports directly
from the PPS reporting system.
Project
Details
Faultless
had just completed their new plant and
wanted to rapidly maximize plant
efficiency to realize a good return on
their new investment. Softrol Systems
proposed a PPS system that monitored, in
real time, output and employee
efficiency on every piece of equipment
on the clean side of the laundry
operation. Some previously established
labor standards were utilized, and
Faultless used the PPS system to
fine-tune these standards.
At every
workstation the employee inserted his or
her smart card
into the PPS module on that
equipment. This allowed the supervisors
to monitor the performance of over to
thirty employees in real time. A large
screen monitor or “Message Center” was
installed so that either the employee or
the supervisors could easily see the
performance of all employees at a
glance. Management could readily see
which pieces of equipment were not
working, working below standard, or
creating a bottleneck. This allowed
management to make adjustments in the
plant without waiting until the end of
the day to see production results.
Any
Faultless manager could also access the
real-time PPS reports from their office
PC and determine how efficiently the
plant was running. Faultless
supervisors saved a significant amount
of supervisory time by being able to
glance at the Message Center and see the
location and size of any production
problem. Further, the supervisors saved
time by not having to write or enter
data for management reports………….the PPS
system automatically produced reports
for daily production and daily worker
performance.
Tim
Higdon, Regional Manager, said “the PPS
System has been a great tool in the
dramatic increase in our PPOH from 90 to
140. I’m a big fan of the system and
Softrol’s support has been excellent!” |